BEACHWOOD – Projects that were approved during the 2019 referendum are still ongoing at the 18 schools and five outbuildings across the 52 square miles of Toms River Regional Schools.
Projects included safety and security upgrades; improving accessibility through the Americans with Disabilities Act (ADA); heating, ventilation, and air conditioning (HVAC) units and controls; door and window replacements; renovating and upgrading high wear and high use areas like science labs and playgrounds, with updated safety standards; and repair and repaving of parking lots and driveways.