SOUTH TOMS RIVER – Borough residents should be aware that weather permitting, milling and paving work will be performed on or about July 26 through August 2.
Roads will be under construction from 7 a.m. to 7 p.m. and during that time there will be no parking on Attison Avenue, Hummel Drive, Dittmar Drive, Applegate Avenue, Easy Street, Duke Drive and Drexel Drive.
Do not leave any unattended cars and drivers should be aware of uneven asphalt on all asphalt surfaces.
Parking will be accessible when asphalt is complete. No work will be done on Saturday and Sunday. Limited access will be available to your residences. Any other questions or concerns can be directed to the Site Supervisor at 732-929-2727.